Installation completes the physical journey of an artwork.
The work begins before arrival, with an understanding of the object, display position, supporting surface, access route, equipment requirements and approved installation method.
Stained Glass Panel with a Holy Man and Six Suppliants, 15th century
01
Pre-Installation Review
Available technical information is reviewed before scheduling delivery.
Object dimensions and weight
Framing or mounting system
Display orientation
Installation height
Wall construction
Floor-loading limits
Access measurements
Door and lift dimensions
Loading-area restrictions
Required equipment
Venue working hours
Site permissions
Health and safety requirements
02
Site Assessment
A site assessment may be required where access, scale, weight or installation complexity cannot be confirmed from the available information.
Vehicle approach
Loading and unloading position
Internal movement route
Floor and wall protection
Stairs, corridors and lifts
Turning clearances
Ceiling height
Display surface
Fixing restrictions
Public-area controls
Equipment positioning
Emergency access
03
Delivery Sequencing
Objects should arrive in an order that supports safe unloading, unpacking and placement.
Approved lifting points, slings, lifting frames, plinth positioning, base restraints, anchor points, component assembly, rotation and floor protection.
Antiques & Decorative Art
Fragile surfaces, historic joints, uneven weight distribution, detachable components, supports, padding, controlled lifting and final stability checks.
Display Cases, Plinths & Mounts
Case delivery, plinth placement, mount readiness, internal positioning, security fittings, lighting access, environmental materials and case closure.
Unpacking
A prepared working area.
Crates are positioned and opened in sequence, internal restraints and protective materials are removed, components are identified and visual condition checks are completed before placement.
Specialist Access & Lifting
Equipment planned in advance.
Large, heavy or unusually positioned works may require scaffolding, mobile towers, material lifts, hoists, cranes, glazing removal, temporary access structures or engineering review.
04
Deinstallation
Removal is planned with the same attention as installation.
Work-area preparation
Object identification
Fixing removal
Component separation
Condition checks
Repacking
Crate closure
Inventory confirmation
Loading sequence
Return or onward transport preparation
Installation Management
Coordinated through placement and return.
NOOR L'Atelier manages the delivery schedule, handling resources, equipment, site communication, unpacking, placement, installation and removal of packing materials. For exhibitions and temporary displays, the same operational plan extends through deinstallation, repacking and return.
Request an Installation Review
Provide the object and site information.
Share the object details, installation address, preferred position, available site information and required completion date.